3.2.5 Weight and Location

For roof mounting, the building's roof must be adequately designed to support the unit weight and any service
personnel. If in doubt a suitably qualified Civil or Structural Engineer should be engaged to conduct an assessment.
The below figures and tables list the corner weights of the units with and without blower.
MODEL
AL18
AL25
AL30
AL36

3.2.6 Lifting

Units are to be lifted by the points specified and designed to lift only the specific units' dry weight. These lifting points
are suitable for either Crane or Helicopter lift with suitable spreader bars. The unit cabinet is lightweight aluminium and
at no point should the lifting slings or spreader bar contact the cabinet, failure to comply will permanently damage the
case.
Lifting point securing bolts and lifting eyes must be inspected for prior to lifting to ensure all bolts are installed, of
correct tensile strength and are correctly tensioned. If any damage is observed, lifting points and/or eyes should be
replaced.
Below is a suggested lifting arrangement. Noting that the centre of gravity should be assessed for each unit prior to
lifting. By suitably qualified crane operator,
by contacting Seeley International.
D
C
Figure 8: Unit Corner Weights
A
37kg
28kg
78kg
71kg
115kg
63kg
140kg
196.5kg
Table 3: Unit Corner Weights
rigger
and dogmen. Certification of the lifting lug assembly may be obtained
Figure 9: Lifting Example
B
A
B
C
27kg
AMI104-A
90kg
84kg
212kg
AL SERIES INSTALL OPERATION MAINTENANCE MANUAL |
D
36k
67kg
115kg
93kg
15

Advertisement

Table of Contents
loading

This manual is also suitable for:

Aira al18Aira al25Aira al30Aira al36

Table of Contents