APPENDIX B: COMMISSIONING REPORT

Unit Details
General Installation
Have Electrical connections been completed by a licensed, experienced person
Electrical Commissioning
Water Commissioning
General Operation
Name:
Electrical Commissioners
Details
License number:
Name:
Water Commissioners
Details
License number:
Unit is adequately secured
Structural bolts and grub screws tight
Duct Work to unit connected
All pads are in position and free of foreign material
Isolator fitted and operating
All wiring secure and terminated
Single or 3 phase power (test)
Fan Belts properly tensioned
Wall Switch/BMS installed
Water Connections Free of Damage
Incoming Water Pressure between 220kPa and 1400kPa
Unit base and reservoir free of debris and clean
Flow to unit can meet 100% of pump requirement
Water isolation ball valve operation
Reservoir checked for leaks
Drain and Overflow Operation
Automatic drain valve operation
Confirm fan can be easily turned by hand
Any transport brackets removed
Wall Switch or BMS activates Fan
Secure Location for Results communicated with owner
Model Number
Serial Number
Installer
Installation Date
Site Address
Unit Condition
Access to the Unit
Condition of Casing
Roof Stand Installation
Flue Installation
Fan Motor / Alignment
Pulleys/ Alignment
Fan direction correct
Water Isolation Fitted
Water supply flushed
Float Valve correctly set
Pad Saturation set
Bleed Valve set
Fan High/Low Operation
Pump Operation
Motor Amps
Date:
Signature:
Date:
Signature:
AL SERIES INSTALL OPERATION MAINTENANCE MANUAL |
Pass = 
Adjust = A
Attention Req. = X