Installation Advice - Insignia AIO 7.5kW Installation Manual

Signature12kw steam generator

Advertisement

1.
If the generator is installed at a place where access is difficult, the water supply valve must be easy to access for emergencies.
2.
A GFCI must be installed on the power supply, power wire, fuse and breaker must comply with the nameplate on the unit and the table (next page).
3.
The solenoid valve can endure maximum 0.8MPa (8kg/cm2) water pressure. To protect the solenoid valve from extremely high water pressure, please
turn down the inlet slightly or install water pressure reducing valve.
4.
Do not install saddle-backed or needle valves on the inlet. Please dredge and clean the pipe before installation.
5.
Strictly no blocked or blended pipes, otherwise this will have a negative effect on the flow of steam and condensate. The steam pipelines should be
installed with a slight angle so that the condensate can flow back to the generator or the steam head.
6.
Steam generator should be installed indoor to avoid freezing.
7.
The generator should be installed and leveled with the arrow pointing upward at an easy-access place, otherwise do not switch on.
8.
The steam pipeline must be copper pipes or stainless-steel pipes, all other material such as plastic, acrylic must not be used since they cannot endure
150°C or higher temperature.
9.
All inlet and apertures should be sealed to prevent any steam escaping and to protect the generator and yourself.
10.
Do not drain water into the steam room from the water tank as may scald, causing serious injury or damage to the steam room.
11.
All inlet water pipes and steam pipelines should be built according to the National Standard and this should be done before sealing the wall.
www.insigniashowers.com