Download Print this page

Insignia AIO 7.5kW Installation Manual page 18

Signature12kw steam generator

Advertisement

www.insigniashowers.com
Last Modified: 06/05/2022
Installation of the Generator
Safety Valve:
This is to release the pressure of steam generator. Use 1/2'' copper pipe or stainless steel pipe to connect the safety valve and the drain pipeline of the
house. DO NOT block it.
Steam Head:
The steam head should be about 300mm from the ground and at least 150mm from the installed seating. Please apply silicone glue on the steam pipe
nipple and back of the steam head, then screw the steam head on to the steam pipe nipple. The Aromatherapy reservoir should face upwards.
Service hole:
Can be used as maintenance hole or another steam outlet 1/2''. For maintenance, please refer to Warranty And Services.
17

Advertisement

loading

Related Products for Insignia AIO 7.5kW

This manual is also suitable for:

Aio 10.5kwAio 12kwAio 15kwAio 18kw