Fig. 47: Installing The Wall Insert 2; Table 50: Tightening Torque (72002) - ABB Power2 850-M Operation Manual

Hide thumbs Also See for Power2 850-M:
Table of Contents

Advertisement

Operation Manual / Power2 850-M / Low-pressure stage
9 Disassembly and assembly / 9.14 Installing the wall insert
Fig. 47: Installing the wall insert 2
Part number
Tightening torque
72002
M16x104
50 Nm
Table 50: Tightening torque (72002)
1. Remove plate (90032), screw (90656), nut (90432) and plates (90031).
2. Remove the bracket (90030).
3. Detach speed measurement cable from provisional holder and insert cable con-
nector (86515).
4. Fit four studs (72002) in the upper area. Observe tightening torque.
© Copyright 2022 ABB. All rights reserved.
HZTL4062_EN
Rev.E
March 2022

Advertisement

Table of Contents
loading

This manual is also suitable for:

Power2 850lpPower2 850 hp

Table of Contents