Huawei ETP4860-B1A2 User Manual page 44

Embedded power
Table of Contents

Advertisement

ETP4860-B1A2 Embedded Power
User Manual
Figure 4-2 Removing the cover of the RTN ground bar at the bottom of the
subrack
Step 2 (Optional) Install an RTN ground cable.
Figure 4-3 Install an RTN ground cable
Step 3 (Optional) Relocate the mounting ears based on the cabinet depth.
Figure 4-4 Installation positions for mounting ears
(1) Adjustable positions
Step 4 (Optional) When installing on an ETSI rack, ensure to use the ETSI mounting ears.
Issue 04 (2021-01-05)
Copyright © Huawei Technologies Co., Ltd.
(2) Default position
4 Installation
37

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents