Placement - Sub-Zero Designer Series Installation Manual

Hide thumbs Also See for Designer Series:
Table of Contents

Advertisement

Available languages

Available languages

Site Preparation

Placement

CAUTION
Before moving the unit into position, secure the
door/drawers closed and protect any finished
flooring.
Use an appliance dolly to move the unit near the opening.
The front leveling legs are extended below the front rollers
to improve stability during placement. Once the unit is
placed in front of the opening, completely retract the front
leveling legs to allow the unit to be rolled into position.
The front and rear leveling legs can be adjusted from the
front once the unit is positioned.
If the unit has been on its back or side, it must stand
upright for a minimum of 24 hours before connecting
power.
Plug the power cord into the grounded outlet and roll the
unit into position. Verify the anti-tip bracket is properly
engaged.
8 | Sub-Zero Customer Care 800.222.7820

Advertisement

Table of Contents
loading

This manual is also suitable for:

Designer 18Designer 24Designer 30

Table of Contents