Placement - Sub-Zero Classic Series Installation Manual

Hide thumbs Also See for Classic Series:
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 1
Site Preparation

Placement

CAUTION
Before moving the unit into position, secure door(s)
closed and protect any finished flooring.
Use an appliance dolly to move the unit near the opening.
If the unit has been on its back or side, it must stand
upright for a minimum of 24 hours before connecting
power.
Plug the power cord into the grounded outlet and roll the
unit into position. Verify the anti-tip brackets are properly
engaged.
IMPORTANT NOTE: If used, the side panels must be
installed before the unit is placed in its final position. Refer
to page 9.
subzero.com | 7

Advertisement

Table of Contents
loading

Table of Contents