11. INSTALLING THE COOKING COMPONENTS
Parts Required:
1
x
Upper Cooking Rack (#1)
2
x
Cooking Grids (#2)
Installation:
•
Place the Cooking Grids, side-by-side, on the grid ledge inside the
Main Barrel. Place the Upper Cooking Rack on the upper ledge inside
the Main Barrel.
NOTE: To maintain the searing and grilling performance of your
Cooking Grids, regular care and maintenance Is required.
12. MOUNTING THE CONTROL KNOBS,
INSTALLING THE IGNITION BATTERY
Parts Required:
2
x
Control Knob (#10)
1
x
Battery (#I)
Installation:
•
Mount each Control Knob to the valve stems on the front panel of the
unit.
•
Next, turn the ignition button cap counter-clockwise to remove it.
Insert the Battery into the housing with the positive (+) terminal
facing outward. Screw the ignition button cap back into place to cover.
13. SECURING THE REGULATOR HOSE
Parts Required:
1
x
Screw (#C)
1
x
Regulator Hose Retainer (#H)
Installation:
•
Attach the Regulator Hose Retainer to the regulator hose, then secure
to the Front-Right Support Leg using one screw.
IMPORTANT: Take care to avoid pinching or damaging the regulator
hosing during installation. This could result in gas leaks once a gas
cylinder is installed.
14. PLACING THE GREASE BUCKET
Parts Required:
1
x
Grease Bucket (#19)
Installation:
•
Place the Grease Bucket on the spout hook on the underside of the
Main Barrel. Ensure it is level to avoid grease spills.
•
The unit is now completely assembled.
12
11
2
12
10
10
13
C
H
14
19
1
2
I