Installing The Cooking Components; Mounting The Control Knobs, Installing The Ignition Battery; Securing The Regulator Hose; Placing The Grease Bucket - Pit Boss Mile Hybrid Assembly & Operation

Wood pellet & gas combo grill
Table of Contents

Advertisement

11. INSTALLING THE COOKING COMPONENTS

Parts Required:
1
x
Upper Cooking Rack (#1)
2
x
Cooking Grids (#2)
Installation:
Place the Cooking Grids, side-by-side, on the grid ledge inside the
Main Barrel. Place the Upper Cooking Rack on the upper ledge inside
the Main Barrel.
NOTE: To maintain the searing and grilling performance of your
Cooking Grids, regular care and maintenance Is required.
12. MOUNTING THE CONTROL KNOBS,
INSTALLING THE IGNITION BATTERY
Parts Required:
2
x
Control Knob (#10)
1
x
Battery (#I)
Installation:
Mount each Control Knob to the valve stems on the front panel of the
unit.
Next, turn the ignition button cap counter-clockwise to remove it.
Insert the Battery into the housing with the positive (+) terminal
facing outward. Screw the ignition button cap back into place to cover.

13. SECURING THE REGULATOR HOSE

Parts Required:
1
x
Screw (#C)
1
x
Regulator Hose Retainer (#H)
Installation:
Attach the Regulator Hose Retainer to the regulator hose, then secure
to the Front-Right Support Leg using one screw.
IMPORTANT: Take care to avoid pinching or damaging the regulator
hosing during installation. This could result in gas leaks once a gas
cylinder is installed.

14. PLACING THE GREASE BUCKET

Parts Required:
1
x
Grease Bucket (#19)
Installation:
Place the Grease Bucket on the spout hook on the underside of the
Main Barrel. Ensure it is level to avoid grease spills.
The unit is now completely assembled.
12
11
2
12
10
10
13
C
H
14
19
1
2
I

Advertisement

Table of Contents
loading

Table of Contents