Unit Preparation
4. Unit Preparation
Every effort has been made to ensure that this unit is in perfect operating condition when received, having passed rigor-
ous quality control testing prior to shipment. To further ensure optimum operation, a brief operational check-out should
be conducted as described in this section.
CAUTION
•
Before attempting to operate the unit, refer to Section 3 to familiarize yourself with the various control functions.
Once you have read and fully understand Section 3, please follow the steps below precisely in order to prevent
equipment damage or malfunction.
4-01.
Settings Prior to Each Check
Prior to proceeding with each of the check-out procedures, ensure that each unit's control panel and valves are set as
described in the following steps.
1. Power Switch
is set to the OFF position.
1
is set to the OFF position.
2. Heat Switch
2
EOF-BIB/FFLT/24/24
EOF-24
EOF-BIB
Continued next page
2
1
1
37