Operation - Nilfisk-Advance SH SOLAR G Instructions For Use Manual

Table of Contents

Advertisement

4.1.6 Application of deter-
gents (internal)
4.2

Operation

4.2.1 Starting up
Original Instructions
If your machine is equipped
with an optional, internally
mounted chemical system –
dosing the chemical to the inlet
of the high pressure pump,
please refer to the separate
"Operating instructions, Chemi-
cal dosing" on this option.
6
4
3
The shut-off cock on the water
inlet should be open, and the
spray handle on the high pres-
sure hose should be closed.
1. Turn the main switch (2) to
position - ON -.
2. Push the green "START"
push button (3).
2
Check on the pressure gauge
(6) that a pressure is being
built up in the system and that
the motor of the machine stops
within appr. 20 seconds with
the green "START" push button
(3) lit. The machine is now in
"Stand-by" mode waiting for the
operator to activate the spray
handle.
If a pressure is not being built
up, vent the machine as de-
scribed in sections 3.9 - 3.10
Venting.
If the motor of the machine
does not start or stops unin-
tendedly with the red "STOP"
push button (4) fl ashing, an
error is present. Read the error
message through the "Inspec-
tion window" and refer to sec-
tion "7 Troubleshooting".
10
SH SOLAR G, GH, GW
15

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sh solar ghSh solar gw

Table of Contents