UPS5000-E-(350 kVA–800 kVA)
User Manual (50 kVA Power Modules)
Mounting
Number of
Fitting
Fittings
Grommet
-
strip
Middle
2
connectin
g plate
Step 1 Use a pallet truck to move the power cabinets and bypass cabinets to the
mounting holes for the cabinets with the power cabinets on the left and the
bypass cabinets on the right. Align the cabinets.
Step 2 Open the front doors of the power cabinets and bypass cabinets.
Step 3 Install the connecting plates between the bypass cabinet and its adjacent power
cabinet based on the following sequence: bottom, top, and middle connecting
plates.
Issue 15 (2022-01-30)
Screw
Specifications
-
M6x30
NO TE
Use a pallet truck to adjust the position of the bypass cabinets to align the front doors of
the bypass cabinets with the front doors of the power cabinets.
Copyright © Huawei Technologies Co., Ltd.
Number of
Torque
Bolts
(PCS)
-
-
4
3
3 Installation
Remarks
● If holes are drilled for
routing cables at the
top of the cabinet,
attach grommet strips
on the hole edges to
protect cables.
Installed on the cabinet
before delivery.
82