UPS5000-E-(30 kVA–120 kVA)-FM
User Manual
Figure 3-28 Connecting signal cables
----End
3.3.5.2 Bottom Cable Routing
Prerequisites
A cable entry cabinet is installed.
Context
Route cables for the UPS from inside out.
Procedure
Step 1 (Optional) Determine the installation position for the cable entry cabinet, and
draw mounting holes in the installation position based on drawings.
Issue 03 (2022-01-30)
NO TE
The number and colors of signal cables are for reference only.