True TUI-15-R-SS-D Install Manual And User Manual page 24

Table of Contents

Advertisement

INSTALLATION
1. Thread the 1/2" NPT connector into the drain
fitting. See fig. 1.
2. With the clamp on the hose, connect the clear
drain hose to the barbed fitting. See fig. 1.
3. Tighten the hose clamp.
NO T E: V ER IF Y T HE ICE M A K ER D R A IN S
T HR OUGH T WO CYCL E S W I T HOU T A N Y D R A IN
A L A R M DUR ING IN S TA L L AT ION.
For more information, see "Drain Time Alarm"
(page 38).
VERTICAL RISE
3/8" I.D. Hose
84" (2,133.6 mm)
1/2" I.D. Hose
48" (1,219.2 mm)
(provided by TRUE)
Hose larger than 1/2" I.D. may require an external pump.
Vertical rise higher that 84" will require external pump.
3 / 8 " I . D . H o s e
( N o t p r o v i d e d
b y T R U E )
Page 24 of 64
T RUE RE S ID E N TI A L
P R I O R T O I N S T A L L A T I O N
MAXIMUM
MAX RUN
100' (30.84 m)
100' (30.84 m)
1 / 2 " I . D . H o s e
( P r o v i d e d
b y T R U E )
8 4 " M A X
( 2 , 1 3 3 . 6 m m )
®
FIG. 1.
Be sure to tightly clamp the drain line into the barbed fitting.
Thread sealant recommended.
4 8 " M A X
( 1 , 2 1 9 . 2 m m )
12/07/2021
1
2
E x t e r n a l
P u m p
E x t e r n a l
P u m p
TEC_TM_155 REV. A

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents