Check Before Power-On; Eu Declaration Of Conformity - Goodwe DNS Series Quick Installation Manual

Solar inverter
Hide thumbs Also See for DNS Series:
Table of Contents

Advertisement

High voltage hazard. Power
off the inverter first before any
operations.
Read through the guide
before any operations.
High-temperature hazard. Do
not touch the equipment to
avoid being burnt.
CE marking
Check before Power-on:
No.
The inverter is firmly installed in a clean place where is well-ventilated and easy to
1
operate.
The PE cable, DC input cable, AC output cable, and communication cable are connected
2
correctly and securely.
3
Cable ties are routed properly and evenly, and no burrs.
4
Unused ports and terminals are sealed.
5
The voltage and frequency at the connection point meet the grid-tied requirements.

EU Declaration of Conformity

The inverters sold in the European market meets the following directives and requirements:
• Electromagnetic compatibility Directive 2014/30/EU (EMC)
• Electrical Apparatus Low Voltage Directive 2014/35/EU (LVD)
• Radio Equipment Directive 2014/53/EU (RED)
• Restrictions of Hazardous Substances Directive 2011/65/EU and (EU) 2015/863 (RoHS)
• Waste Electrical and Electronic Equipment 2012/19/EU
• Registation, Evaluation, Authorisation and Restriction of Chemicals (EC)No 1907/2006 (REACH)
For more detailed declarations of conformity, visit https://en.goodwe.com.
Potential risks exist. Wear
proper PPE before any
operations.
Delayed discharge. Wait until
the components are totally
discharged after power off.
5min
Do not dispose of the product
as household waste. Discard
the product in compliance with
local laws and regulations,
or send it back to the
manufacturer.
Grounding point. Indicates the
position for connecting the PE
cable.
Check Item
02

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents