Chapter 2: Prerequisites; Space Requirements; Clearance - Labconco Protector 3390000 User Manual

Benchtop evidence drying cabinets
Hide thumbs Also See for Protector 3390000:
Table of Contents

Advertisement

C
h
a
p
t
e
r
2
C
h
a
p
t
e
r
2
P
r
e
r
e
q
u
i
s
P
r
e
r
e
q
u
i
s
Before you install the evidence drying cabinet, you need to plan the site for
installation. Examine the location where you intend to install the cabinet.
You must be certain that the area is level and of solid construction. In
addition, a source of electrical power must be located near the installation
site.
Carefully read this chapter to learn:
 Location requirements.
 Electrical power requirements.
 Exhaust requirements.
 Service utility requirements.
 Space requirements.
Refer to Appendix C: Specifications, for complete cabinet electrical and
environmental conditions, specifications and requirements.

Space Requirements

The dimensions for the evidence drying cabinet are shown in Appendix B:
Dimensions.

Clearance

A minimum clearance of at least 6 inches (150 mm) is suggested on the top
of the cabinet for service. There should be 36 inches (914 mm) clearance at
the front of the cabinet to allow the door to swing open without hitting any
obstructions.
2
:
:
i
t
e
s
i
t
e
s
Product Service 1-800-522-7658

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Protector 3390000 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

This manual is also suitable for:

Protector 3390001

Table of Contents