M150 - 13 Ft - MacDon R80 Operator's Manual

Rotary disc self-propelled windrower header
Hide thumbs Also See for R80:
Table of Contents

Advertisement

6.3.2 M150 - 13 FT

C
a. Disengage
and
rotate
clockwise to fully up position.
b. Remove cap (B) securing electrical connector to
frame.
C
c. Move hose bundle (C) from windrower, and rest
bundle on to header.
d. Check that hose support is positioned so that
lower bolt is in forward hole and support is
positioned as shown. Loosen bolts and adjust
as required.
Form # 169089
OPERATION
B
A
lever
(A)
counter-
16 FT SHOWN – 13 FT SIMILAR
e. Route hose bundle (C) from windrower through
support (D) on header.
f.
Route header return and pressure hose bundle
(E) through support (D) on header, to windrower.
g. Lower and lock lever (A).
h. Secure hose bundles with three cinch straps (F).
i.
Connect single hose (E) from header to coupler
(F) on middle valve block as shown
16
E
D
C
A
F
F
(continued next page)
Model Year - 2010

Advertisement

Table of Contents
loading

Table of Contents