NOTE:
Keep the boom connections clean and off the ground while routing.
Do not secure cables with cable ties until all cables are in place and routings are checked for pinch
points and other interferences.
Ensure sufficient slack is available at fold and break-away joints to allow for full range of motion
without stretching the cable.
4. Next, repeat step 2 through 3 for the inner boom cable for the opposite side.
5. Continue routing both mid and outer boom cables by starting each consecutive cable at the end of the
previous cable, and repeat step 2 through 4 until all cables have been routed.
NOTE:
The connector with the rotating locking collar will always go towards the center of the machine.
6. If not already applied, apply a single, short burst of corrosion inhibitor to all connections. Corrosion X HD (P/N
222-0000-020 or available from http://www.corrosionx.com/corrosionx-heavy-duty.html) is recommended.
FIGURE 3. Boom Cable Routing - Over Mid Fold Joint
7. Be sure the corrosion inhibitor has coated the connector electrical contacts and recessed portions of the
connector.
NOTE:
To determine if corrosion inhibitor has been applied, inspect for a thick liquid in the bottom of the
connector.