6. Dry out the connection with dry, compressed air. Dust Off Electronics Duster (P/N 222-4001-007) is
recommended however, if unavailable, alternate compressed air sources can be used. If using compressed air
from a large volume air compressor, be sure the lines are free of moisture.
7. If not already applied, apply a single short burst of corrosion inhibitor (Corrosion X HD (Raven P/N 222-0000-
020 or available from http://www.corrosionx.com/corrosionx-heavy-duty.html)) into the NCV connection. Be
sure the corrosion inhibitor has coated the NCV contacts and recessed portions of the connector.
NOTE:
To determine is corrosion inhibitor has been applied, inspect for a thick liquid in the bottom of the
connector (as shown in the Corrosion Inhibitor Applied image below).
Applying Corrosion Inhibitor
Cable and Connector Maintenance: Hawkeye® 2 Boom Harness Connector Maintenance
CABLE AND CONNECTOR MAINTENANCE
Corrosion Inhibitor Applied