4.2.2 Opening a new hole

Choose a central area of the roof between
two side members and trace the outline of a
360 mm square with a felt-tip pen (fig.2) and
(fig. 4 ref. 1).
The size of the 360x360 mm
opening,
shown
template (Fig.2), is purely indicative.
Before cutting the roof, check the actual
size of the hole with a measuring tape.
Cut the new opening in the roof carefully with
a saw: be careful not to cut any electrical
wires (fig. 4 ref. 2).
Rev.001
placed
in
special
on
the
cardboard
Fix a reinforcement frame around the
opening (fig. 5).

4.2.3 Power lead

A 3-core cable with a 2.5 mm² cross-section
(live-neutral-earth) must be routed for the
power supply of the air conditioner. The wires
at one end must be connected to the thermal
magnetic circuit breaker (recommended load
10A) previously installed in the vehicle's
electrical distribution panel exclusively for the
air conditioner. The other end should reach
the opening made in the roof of the vehicle
and protrude from the hole in the reinforcing
frame by approximately 50 cm in order to
facilitate connection to the air conditioner
(Fig. 6).
The
electrical
protected in order to ensure its integrity and
insulation in all conditions of use of the
vehicle.
9
cable
must
be
suitably
ICE S 2800

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents