1U1N Configuration Equipment Installation
Hardware Installation Guide
28
Note
Install all the equipment in the cabinet before installing and connecting the power and
I/O cables.
Install the equipment as described in
l
page 20.
If you are installing the minimum configuration, refer to the figure and table below
l
for minimum configurations for the equipment stack up in the cabinet.
If you are installing the maximum configuration, refer to the figure and table below
l
for maximum configurations for the equipment stack up in the cabinet.
Component
Description
Function
Data Server
R640 Server
Management Server
Management Server
Management Switch
Customer provided 1
GbE switch
Data Switch
Customer provided 10
GbE switch
Installation of the equipment in the cabinet
Table 7 Minimum configuration in 3-phase wye power
distribution cabinets
Quantity
3
1
1
2
on
Cabinet U Space
2 - 4
20
21
23-24