Installation Of The Equipment In The Cabinet; Installation In Cabinets With Single-Phase Power Distribution; Minimum Configuration In Single-Phase Power Distribution Cabinets; Distribution - Dell EMC ScaleIO Ready Node 14G Hardware Installation Manual

Hide thumbs Also See for EMC ScaleIO Ready Node 14G:
Table of Contents

Advertisement

1U1N Configuration Equipment Installation

Installation of the equipment in the cabinet

Installation in cabinets with single-phase power distribution

Hardware Installation Guide
20
Install equipment in the cabinet or rack. Always begin component installation at the
bottom of the cabinet and work upward. Install components at the lowest available
space for that component type.
Placement of the equipment in the cabinet is dependent on the type of power
distribution units installed in the cabinet. Refer to the equipment stack up guidelines
for each type of power distribution.
Install the servers as described in the following sections. Most of the servers will
l
function as ScaleIO nodes, and at least one will function as a management server.
The procedures for physical installation in the rack or cabinet apply to both types.
Once the servers have been installed, refer to the ScaleIO Hardware Configuration
and Operating System Installation Guide (for your system's operating system), for
server configuration and operating system installation procedures.
Install the management switches
l
Install the data switches
l
Note
Install all the equipment in the cabinet before installing and connecting the power and
I/O cables.
Install the equipment as described in
l
page 20.
If you are installing the minimum configuration, refer to the figure and table below
l
for minimum configurations for the equipment stack up in the cabinet.
If you are installing the maximum configuration, refer to the figure and table below
l
for maximum configurations for the equipment stack up in the cabinet.
Component
Description
Function
Data Server
R640 Server
Management Server
Management Server
Management Switch
Customer provided 1
GbE switch
Data Switch
Customer provided 10
GbE switch

Installation of the equipment in the cabinet

Table 3 Minimum configuration in single-phase power
distribution cabinets
Quantity
3
1
1
2
on
Cabinet U Space
2 - 4
18
19
21 - 22

Advertisement

Table of Contents
loading

Table of Contents