Guidelines For Installing And Connecting Management Network Cables; Console And Management Ports On Switches - Dell EMC ScaleIO Ready Node 14G Hardware Installation Manual

Hide thumbs Also See for EMC ScaleIO Ready Node 14G:
Table of Contents

Advertisement

Install Management Network I/O Cables
Guidelines for installing and connecting management
network cables
Hardware Installation Guide
50
Use the following illustration as reference for console and management ports on the
switches.
Figure 20 Console and management ports on switches
Note
As cables are installed and connected, dress and tie cables frequently so that excess
slack does not interfere with routing of adjacent cables.
Refer to the management network cable diagrams applicable to your installation:
Management network A, nodes 1 - 16
l
on page 51
Management network B, nodes 17 - 22
l
cabling
on page 53.
Management network B, nodes 23 - 32
l
cabling
on page 53.
Management network A, nodes 1 - 16 cabling
Management network A, nodes 17 - 22
Management network B, nodes 23 - 32

Advertisement

Table of Contents
loading

Table of Contents