Minimum Configuration In 3-Phase Wye Power Distribution Cabinets - Dell 100 Series Hardware Installation Manual

Hide thumbs Also See for 100 Series:
Table of Contents

Advertisement

Installation Guidelines and Cabinet Stack Up
VxRack Node Hardware Installation Guide
24
Note
Install all the equipment in the cabinet before installing and connecting the power and
I/O cables.
Install the equipment as described in
l
If you are installing the minimum configuration, refer to Table 7 and Figure 5 for
l
the equipment stack up in the cabinet.
If you are installing the maximum configuration, refer to Table 8 and Figure 6 for
l
the equipment stack up in the cabinet.
Component
Description
Function
Data Server
D51B-1U Server
Management Server
Kylin 1U Server
Management Switch
Arista 7010T-48
Data Switch
Arista 7050-64
Equipment Installation
Table 7 Minimum configuration in 3-phase wye power
distribution cabinets
Quantity
3
1
1
2
on page 29.
Cabinet U Space
2 - 4
20
21
23-24

Advertisement

Table of Contents
loading