Installation Requirements; Time And Items Required; Parts List - Extreme Networks ExtremeRouting SLX 9640 Installation Manual

Table of Contents

Advertisement

Mounting the Device

Installation requirements

Review the installation and facility requirements for your product before mounting the device . Refer to
the hardware installation guide for your product for more information.
Lifting requirements
For 1U and 2U devices, two people are required to install the device in a rack. One person holds the
device, while the other screws in the front and rear "L" brackets.

Time and items required

Allow 15 to 30 minutes to complete the installation.
The following items are required to install the device using the Universal Two-Post Rack Kit:
#2 Phillips torque screwdriver
1/4-inch slotted-blade torque screwdriver

Parts list

The following parts are provided with the Universal Two-Post Rack Kit (XEN-R000294).
Figure 9: XEN-R000294 Rack Parts list
1. Front brackets (2)
2. Rear brackets 5-6 inch post (2)
3. Rear brackets 3-5 inch post (2)
ExtremeRouting SLX 9640 Hardware Installation Guide
Installation requirements
29

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the ExtremeRouting SLX 9640 and is the answer not in the manual?

This manual is also suitable for:

Extremerouting slx 9640 seriesEn-slx9640-24sEn-slx 9640-24s-ac-fEn-slx 9640-24s-12cEn-slx 9640-24s-12c-ac-f

Table of Contents