Commissioning

Initial switch-on

Important notes
Additional functions
Initial switch-on
DANGER!
Unexpected states during commissioning
Incorrect wiring can cause unexpected states during the commissioning phase.
Possible consequences: Death, severe injuries, or damage to property
• Wiring must be complete and correct.
• Wiring must be free of short circuits and earth faults.
• The motor circuit configuration (star/delta) must be adapted to the inverter.
• The motor must be connected in-phase (rotating direction).
• The "emergency off" function of the overall system must operate correctly.
• Clear hazardous area.
• Observe safety instructions and safety clearances.
Preconditions:
• The power connections must be wired.
• The digital inputs X3/DI1 (start/stop), X3/DI3 (reversal) and X3/DI4 (frequency preset 20 Hz)
must be wired.
• The analog input X3/AI1 must not be wired or connected to GND.
1. Switch on mains voltage.
2. Check readiness for operation.
3. Observe LED status displays "RDY" and "ERR" on the inverter front panel.
© 11/2021 · EN · www.Lenze.com
Keypad module
Keypad control
Terminal control
Extended
Parameter overview
Favorites
terminal control
Operating instructions i510 cabinet frequency inverter | 22
Basic setting
Motor control

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents