Storage Canopy SHELTER Assembly Manual

L33 x w 24 x h 11ft

Advertisement

Quick Links

SHELTER
ASSEMBLY MANUAL
L33 x W 24 x H 11ft

Advertisement

loading
Need help?

Need help?

Do you have a question about the SHELTER and is the answer not in the manual?

Questions and answers

Summary of Contents for Storage Canopy SHELTER

  • Page 1 SHELTER ASSEMBLY MANUAL L33 x W 24 x H 11ft...
  • Page 2: Specification

    SPECIFICATION Length: 50 Width: 33 Height: 17 ft IMPORTANT --- READ MANUAL FIRST Improper site preparation, assembly and maintenance may invalidate warranty and cause unnecessary and costly mistakes. If you have any questions contact your local dealer. For User Friendly assembly we have identified each individual component with the part code as indicated in the parts list.
  • Page 3 PartsList Part Description Roof bent tube 4 sets Roof bent tube for front and back door 2 sets Sidewall bent tube 8 sets Sidewall bent tube for front door 4 sets Shoulder bent tube 12 sets Standing leg 10sets Standing leg for for mechanical door 2sets Purlin Ratchet...
  • Page 5: Installation Process

    Figure 1: Frame Sketch EQUIPMENT AND TOOLS FOR INSTALLATION 1. Measuring Tape 2. String for alignment 3. Stake 4. Ladder or Scissors Lift 5. Sledge Hammer 6. Drill 7. Wrench 8.Knife 9. Hoist INSTALLATION PROCESS A --- BASE INSTALLATION Please refer to the diagram (Figure 2) to place the base plates: Figure 2 Base Plate 1.
  • Page 6: Installation

    B---FRAME INSTALLATION Figure 3 Frame...
  • Page 7 Figure 4Front door frame Figure 5Backdoor frame 1. Figure 3 shows to connect the Roof bent tube(No.1),Middle bent tube(No.2),Shoulder bent tube(No.3),Standing leg(No.4) use Bolt 8x70(No.22) to be one arch. . Figure 4&5 shows to install front and back door frame 2.
  • Page 8 This page’s figure shows to arrangement of arch frame...
  • Page 9 Figure 6: Front door 1. Figure 6 shows to assembly the door frame according to Figure 4. Figure 8: Front Cover...
  • Page 10 3.Insert the vertical pipe into front and back door through the pockets on covers, assembly the Mechanical wheel, tidy the front door and back door covers by using Rope(No.27), make the cover well fold to the frame first and then tension the cover. E--- INSTALLING THE ROOF COVER NOTE: Do not install the cover onto the frame of your building in high wind conditions.
  • Page 11 Figure13 1. When Roof cover is over top of Frame assembly (see Figure 11, insert the tensioning tubes (No.21) into pockets along both sides of Roof cover, cut opening for Nylon band for ratchet, find the Nylon band over tube feed end into tie down to ratchet (No.6).