Page 3
YOU MUST READ THIS DOCUMENT BEFORE YOU BEGIN TO ASSEMBLE THE SHELTER. Thank you for purchasing our shelter. When properly assembled and maintained, this product will provide years of reliable service. These instructions include helpful hints and important information needed to safely assemble and properly maintain the shelter. Please read these instructions before you begin.
Double Truss Building SST336020 (W10xL18xH6.2m) with mechanical door W3.66xH4.2m on one end Parts List Part Qty/ Description Code Roof Section top truss for 2nd to 9th arch top truss for 1st arch top truss for 10th arch roof truss for 2nd to 9th arch...
Page 5
corner base plate (left & right) for 1st and 10th arch, installed with ratchet interior base plate for 2nd to 9th arch, installed with ratchet tube clip for steel wire No.21 bolt M8x60 for truss swaged end connection bolt M10x70 for purlin connection end plug (Φ40) for tensioning tube No.7...
Page 6
connection plate for square tube post No.22, 23, 24, 25, 2 sets (1+1) pcs/set cross beam for front door, 1 set (1+1) pcs/set vertical tube for door beam No.27 upper rail for front wall lower rail for front wall front door winch bracket support tube for winch bracket pole for door opening door bracing tube, (1+1)
Page 7
door winch front cover Back Wall post for back wall post for back wall post for back wall post for back wall rail for back wall rail for back wall rail for back wall rail for back wall base plate for back wall bolt M10x30 for rail and connection plate bolt M10x50 for post and truss...
INSTALLATION PROCESS A—BASE PLATES INSTALLATION Please refer to the below diagram to mark the position of base plate. The measurement is from center to center of base plates. Referring to the diagram and confirm the place of base plates. ENSURE THAT THE FOUNDATION IS SQUARE. Note: The expansion bolt (No.18, No.43, No.63) applies for fixing base plate on concrete ground.
Page 9
B—FRAME INSTALLATION First Arch and Front Wall 1. Find Trusses (No.1A, 2A, 3A, 4) for first arch and connect them by bolt M8x60 (No.11). 2. Find relative parts of posts and rails for front wall and assemble them according to the below diagram.
Page 10
Second Arch to Ninth Arch Installation 3. Find Trusses (No.1, 2, 3 and 4) for second to ninth arch and connect them by bolt M8x60 (No.11). 2022GK8002 Page 10 article No.26498...
Page 11
Tenth Arch and Back Wall 4. Find Trusses (No.1B, 2B, 3A, 4A) for tenth arch and connect them by bolt M8x60 (No.11). 5. Find relative parts of posts and rails for back wall and assemble them according to the below diagram.
Page 12
Purlin and Steel Wire Installation 6. Lift the assembled arches onto base plates (No.8 and No.9) and connect them by bolt M8x60 (No.11). 7. When finish installing the first and second arches, install purlin (No.5) and connect them by bolt M10x70 (No.12).
Page 13
C-INSTALLING COVER Front Cover and Mechanical Door Installation Install the mechanical door refer to the diagram bellow. Mechanical Door Installation 2022GK8002 Page 13 article No.26498...
Page 14
1. Install the front door frame and door winch bracket 2. Fix the winch to the bracket. Make sure the winch handle faces the outside. Refer to Figure 1. 2022GK8002 Page 14 article No.26498...
Page 15
3. Take out the door curtain cloth and lay it on the ground. Pay attention to the direction. The side with pipe pockets faces inward. 4. Connect the door bracing tube (2pcs/set) with M6x40 bolt. 5. Thread the door bracing tube into the pocket from top to bottom. Pay attention to the bottom bracing tube.
Page 16
6. Put the steel wire rope through the pulley on the door frame as shown in Figure 3, so that the steel wire rope is located on the inner side of the door frame and on the same plane as the pulley, and then the steel wire rope sags naturally.
Page 17
9. Adjust the length of the steel wire rope to be equal on both sides.Fix the wire rope fold to the hole in the winch. Refer to Figure 4. 2022GK8002 Page 17 article No.26498...
Page 18
10. Turn the winch clockwise to lift the door curtain cloth and bracing tubes to a position about 40-50cm away from the cross beam. Lace the eyelets on the cloth to cross beam with a rope. Refer to Figure 5. 2022GK8002 Page 18 article No.26498...
Page 19
11. Now the winch door installation is completed.Turn the winch clockwise to raise and counterclockwise to lower the door. The steel wire rope shall be evenly wound on the winch so that the door can rise and fall smoothly. 2022GK8002 Page 19 article No.26498...
Front Cover Installation Install front cover (No.47) to the first arch and posts and rails on front wall with rope (No.41) and cable tie (No.42). Back Cover Installation Install back cover (No.64) to the tenth arch and posts and rails on back wall with rope (No.61) and cable tie (No.62).
Page 21
Roof Cover Installation NOTE: DO NOT install the cover onto the frame of your building in high wind conditions. A slight breeze is the most advantageous for cover installation. To take advantage of the breeze, pull the cover up over the arches with the breeze blowing in the cover like a sail filled with air. 1.
Page 22
Now your assembly is completed 2022GK8002 Page 22 article No.26498...