Installation And Commissioning - RADEMACHER ReWiSo 2696 Instruction Manual For The Electrical Connection And For Commissioning

Table of Contents

Advertisement

i

Installation and commissioning

EN
Caution: mains voltage! The VDE regulations must be observed.
Installation, testing, commissioning and troubleshooting on the controller may only
be carried out by a qualified electrician (according to VDE 0100). Isolate all lines
to be installed and take appropriate safety precautions to prevent any unintentional
switching on.
The controller is designed exclusively for its intended use. Any unauthorised modification
or failure to observe the operating manual will void all warranty and guarantee claims.
After unpacking the controller, inspect it immediately for possible mechanical damage.
If transport damage is discovered, please notify the supplier immediately.
A damaged controller must not be put into operation.
If it is suspected that safe operation of the controller or the connected drives is not possible,
the system must be switched off and secured to prevent unintentional operation.
The controller together with the weather station may only be used as a stationary
installation, i.e. only in its installed state and after completion of all installation and
commissioning operations and only in the intended environment.
RADEMACHER can assume no liability for amendments to the standards or regulations
after publication of this operating manual.