Installation and Commissioning

GB
Caution! Mains voltage!
The VDE regulations must be observed.
Installation, testing, commissioning and troubleshooting on the controller may only be
carried out by a qualified electrician. Isolate all lines to be installed and take appropriate
safety precautions to prevent unintentional switching on.
The controller is designed exclusively for its intended use. Any unauthorised modification
or failure to observe the operating instructions will void all warranty and guarantee
claims.
After unpacking the controller, inspect it immediately for possible mechanical damage.
If transport damage is discovered, please notify the supplier immediately.
A damaged controller must not be put into operation.
If it is suspected that safe operation of the controller or the connected drives is not
possible, the system must be switched off and secured to prevent unintentional
operation.
The controller with weather station may only be used as a stationary installation, i.e.
only in installed state and after completion of all installation and commissioning
operations and only in the intended environment.
Rademacher can assume no liability for amendments to the standards or regulations
after publication of these operating instructions.