GEM eSyStep Q50 Operating Instructions Manual page 49

Motorized pinch valve positioner
Hide thumbs Also See for eSyStep Q50:
Table of Contents

Advertisement

14.2 Troubleshooting
Error
The product leaks downstream (doesn't
close or doesn't close fully)
The product doesn't open or doesn't
open fully
The product doesn't close or doesn't
close fully
www.gemu-group.com
Possible cause
Operating pressure too high
Tube leaking or damaged
Actuator defective
Foreign matter in the product
The actuator design is not suitable for
the operating conditions
Voltage is not connected
Cable ends incorrectly wired
The actuator design is not suitable for
the operating conditions
Foreign matter in the product
Voltage is not connected
49 / 53
14 Troubleshooting
Troubleshooting
Operate the product with operating pres-
sure specified in datasheet
Check tube for potential damage, replace
tube if necessary
Replace valve
Remove and clean the product
Use an actuator that is designed for the
operating conditions
Connect voltage
Wire cable ends correctly
Use an actuator that is designed for the
operating conditions
Remove and clean the product
Connect voltage
GEMÜ Q50 eSyStep
Positioner (Code S0, S5, S6)

Advertisement

Table of Contents
loading

This manual is also suitable for:

Q50 esystepS0S5S6

Table of Contents