GEM eSyStep Q50 Operating Instructions Manual page 47

Motorized pinch valve positioner
Hide thumbs Also See for eSyStep Q50:
Table of Contents

Advertisement

13.5 Installing the compressor
CAUTION
Risk of crushing due to the compressor
shutting down!
▶ Severe injury due to crushing or
shearing of the fingers.
Ensure that the actuator remains in
the open position while replacing the
compressor.
Do not reach into the tube crushing
area.
1. Remove the tube (see "Removing the tube", page 46).
2. Disassemble the tube holder (see "Disassembling the
tube holder", page 46).
3. Disassemble the compressor (see "Disassembling the
compressor", page 46).
4. Insert the compressor 2 and press upwards until the
compressor engages.
5. Move the actuator A to the open position.
13.6 Assembling the tube holder
1. Disassemble the tube holder (see "Disassembling the
tube holder", page 46).
1
c
2. Insert the tube holder 1.
3. Tighten the fixing screw c using a hex driver.
www.gemu-group.com
13.7 Inserting the tube
1. Remove the tube (see "Removing the tube", page 46).
2. Insert the tube.
3. Close the tube holder 1.
2
4. Turn the locking ring b by 90° in the direction of the arrow.
5. With the valve fully assembled, check the function and
47 / 53
1
b
ð The word "locked" can be read on the tube holder.
tightness.
13 Inspection and maintenance
GEMÜ Q50 eSyStep
Positioner (Code S0, S5, S6)

Advertisement

Table of Contents
loading

This manual is also suitable for:

Q50 esystepS0S5S6

Table of Contents