GEM eSyStep Q50 Operating Instructions Manual page 46

Motorized pinch valve positioner
Hide thumbs Also See for eSyStep Q50:
Table of Contents

Advertisement

13 Inspection and maintenance
13.2 Removing the tube
CAUTION
Risk of crushing!
▶ While the tube holder is open, the ac-
tuator can move. Severe injury due to
crushing or shearing of the fingers.
Ensure that the actuator remains in
the open position during tube replace-
ment.
Do not reach into the tube crushing
area.
1. Move the actuator A to the open position.
b
2. Turn the locking ring b by 90° in the direction of the arrow.
ð The word "unlocked" can be read on the tube holder.
3. Open the tube holder 1.
4. Remove the tube.
GEMÜ Q50 eSyStep
Positioner (Code S0, S5, S6)
1
13.3 Disassembling the tube holder
1. Remove the tube (see "Removing the tube", page 46).
2. Loosen the fixing screw c using a hex driver.
3. Remove the tube holder 1.
13.4 Disassembling the compressor
Risk of crushing due to the compressor
shutting down!
▶ Severe injury due to crushing or
1. Remove the tube (see "Removing the tube", page 46).
2. Disassemble the tube holder (see "Disassembling the
tube holder", page 46).
3. Move the actuator A to the closed position.
4. Pull the compressor 2 out downwards.
46 / 53
1
c
CAUTION
shearing of the fingers.
Ensure that the actuator remains in
the open position while replacing the
compressor.
Do not reach into the tube crushing
area.
2
www.gemu-group.com

Advertisement

Table of Contents
loading

This manual is also suitable for:

Q50 esystepS0S5S6

Table of Contents