Operation
To transport the device without gripping goods, it is done in the "empty stroke position" (see Ill. I).
For this the automatic release (2) must be locked (see Ill. J 1).
This is achieved, when the gripping good is lowered on the ground and the empty device (WEZ) without
gripping good) is lifted.
Lift the device approx. 20 cm from the ground, pull out the spring pin (1) and turn a little at the same time
until it clicks into place (now the device can be transported on the carrier (e.g. excavator) - without the
grippers closing accidentally.
As soon as the device comes back to work (lifting of L-stones), the automatic release (2) must first be
unlocked again ( Ill. J 1).
For this the device must be positioned on a level ground!!
Otherwise there is a risk of injury (due to uncontrolled movements of the device)
Pull spring cotter (1) out again and turn by 180 ° ( Ill. J).
Ill. I
5310.0347
Ill. J
V3
19 / 24
Ill. J 1
GB

Advertisement

Chapters

Table of Contents
loading
Need help?

Need help?

Do you have a question about the WEZ-2 and is the answer not in the manual?

Questions and answers

Table of Contents