NB. Do not adjust the tilt cylinders before they are
installed onto the platform. Tilt cylinders are pre-
adjusted at the factory.
1. Tilt up so that the platform closes ie. the tilt cylin-
ders are extended as far as the geometry allows.
See pict 16. NB. Adjustment according to "3" should
always be made when the tilt cylinders are fully pres-
surized.
2. Loosen lock nuts, see pict 17
(Zepro tool 54599).
3. Turn the adjusment collar (spanner width 50mm)
as seen from above, as per pict 17 (Zepro tool
54600), alternately the right cylinder and then left
one, so that the platform fits exactly to the body as
per pict B. NB. Always adjust right and left sides the
same.
4. In order to ensure that the lock nut and collar re-
main in the desired position we recommend that they
are secured with loctite 243 or similar.
Apply enough Loctite on the pressure rod's thread so
that there is enough to also secure the collar when
the lock nut is tightened. See pict. 18
5. Tighten the lock nuts against the collar. Measure
as per in pict 19. NB. Max. 50 mm between the mark
on the push rod and the tightened lock nut. Lock nut
torque is minimum 100 Nm.
Pict. 16
8. Installation, continued
30
Pict. 17
Out
Art. no. 54600
In
Pict. 18
Apply Loctite here
Lock nut
Pict. 19
Max 50 mm