Installation of platform
Install platform onto the lift arms and tilt cylinders to
the platform. Use axles and support wheels provided
(280 Nm). pict 10.
Pict. 10
The platform´s overlap (A) is dependent on the type
of platform. Please note the values below which are
particulary relevant when installing a rubber seal on
the body at the top of the platform.
Pict. 11
Steel
A (mm)
70
When the platform is installed you should test run the
lift carefully. Remember that the lift is only fastened
to the frame temporarily. Check the platform position
at rear beam. Adjust the position of the lift if neces-
sary. See picture 11.
8. Installation, continued
A
Flat 40 mm
Conical
81
77
Max 40 mm, Min 38 mm
Pict. 12
Tighten all nuts (see section 4). Weld the square
shaped washers to the brackets. 8 bolts at every
bracket.
Sealing system (horizontal)
Install the horizontal aluminium or steel guide bar.
Self-tapping screws delivered. Drill 7.2 mm holes.
Mitre the rubber against the side seal. Bag 3. See
pictures 13
Sealing system (vertical)
Install the rails for the vertical sealing strips. Note the
position of the lock ears.
They can be fastened with screws, rivets or welding.
The rubber strips are installed after the lock ears.
The rubber strips are locked by pressing the rails
together.
If upper seal must be installed you must mitre 45
degrees against vertical stripes.
Pict. 13