Before Installation - Phocos Any-Grid Series User And Installation Manual

Pure sine wave grid inverter with mppt solar charge controller
Hide thumbs Also See for Any-Grid Series:
Table of Contents

Advertisement

fastest and best service.
Check the following after unpacking:
1.
Ensure no damage to the inverter unit.
2.
Ensure the operation manual, port and installation accessories in the package.
3.
Ensure no damage to the items in the package and that no items are missing.
4.
Ensure the information of the order is the same as that of the name plate.
5.
The standard delivery list is shown as below.
Packing list:
No.
Name
1
Inverter
2
Installation bracket
3
User and installation manual
4
Assembling bolt M5x20
5
Expansion bolts M6x60
6
Communication connector
7
DC connector (PV)
8
AC connector

Before Installation

Installation Tools
No.
Installation Tool
1
Marking pen
2
Electric drill
3
Hammer
4
Monkey wrench
www.phocos.com
Figure 7: Inverter packing list
Quantity
1 pc.
1 pc.
1 pc.
2 pcs.
≤ 3 kW inverter nominal power: 3 pcs.
≥ 4 kW inverter nominal power: 4 pcs.
1 pc.
≤ 3 kW inverter nominal power: 1 pair
≥ 4 kW inverter nominal power: 2 pairs
1 pc.
Instruction
Mark the installation hole
Drill in the bracket or wall
Hammer on the expansion bolts
Fix the installation bracket
9 |
P a g e

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Any-Grid Series and is the answer not in the manual?

Table of Contents