Best Practices For Testing the Environment
Test the storage enivornment by doing the following:
Boot the OS on the host server, and then disable the primary path to the SAN boot device to
validate the multipath connection.
Physically pull the cable from the system.
Intentionally disrupt zoning at the FC switch that you plan to attach to the universal HBA.
If you have installed any alternate boot LUNs, try to boot from those (after disrupting the
primary connection(s)).
Make sure the boot LUN is set as the first boot device in the system BIOS/UEFI settings.

Installing the Hardware

Follow the procedures in this section to install the hardware:
"To Install the Universal HBA" on page 29
"Connecting the Cables" on page 30
"To Apply Power" on page 34

To Install the Universal HBA

If the system in which you are installing the universal HBA is running the Oracle
1.
Solaris OS, install the two driver patches or SRU for your platform, as described
in
"Driver Software for the Oracle Solaris OS" on page
2.
Attach an ESD wrist strap to your wrist (see
Precautions" on page
3.
Refer to your system installation or service manual to determine an appropriate
PCI Express slot in which to install the universal host bus adapter.
4.
Refer to your system documentation to shut down, power off, and unplug the
system, if required.
Remove the system case and the blank panel from an empty PCI Express slot.
5.
21).
Chapter 2 • Universal HBA Installation and Removal
Installing the Hardware
59.
"Observing ESD and Handling
29

Advertisement

Table of Contents
loading

This manual is also suitable for:

7101674

Table of Contents