To Replace The Pci Bracket - Oracle Sun Storage HBA Installation Manual

16 gb fibre channel pcie universal host bus adapter, qlogic
Table of Contents

Advertisement

3.
Grasp the module by both corners and pull the SFP+ module to disengage it
from the SFP+ cage.
Pull the module out until it is free of the slot.
4.
Insert a protective end cap into the optical cage of the SFP+ module.
5.
Push the locking handle back into its vertical position.
6.
7.
Place the module in its original packaging, antistatic bag, or other protective
environment.

To Replace the PCI Bracket

The universal host bus adapter (HBA) comes with a low-profile PCI bracket installed. This
bracket is approximately 3.11 in. (7.9 cm) long. A standard mounting bracket, which is
approximately 4.75 in. (12.06 cm), is provided in the ship kit box. You might need to perform
the procedure in this section if the system in which you plan to install the universal HBA
requires a standard mounting bracket.
If you do not know which PCI bracket you need to install, refer to your system documentation.
1.
Attach an ESD strap to your wrist, as described in
Precautions" on page
Remove all SFP+ modules from the universal HBA, if any are installed
2.
(for instructions, see
" on page
24).
Replacement of SFP+ modules with supported modules from Oracle does not void
Caution -
the warranty. Replacement of SFP+ modules with non-Oracle supported modules will void the
warranty or serviceability of the universal HBA.
21.
"To Remove an SFP+ Optical Transceiver Module
Chapter 2 • Universal HBA Installation and Removal
To Replace the PCI Bracket
"Observing ESD and Handling
25

Advertisement

Table of Contents
loading

This manual is also suitable for:

7101674

Table of Contents