Day Of Week (Dn, N = 1 To 7) - Pentair FLECK 9100 SXT Installer Manual

Hide thumbs Also See for FLECK 9100 SXT:
Table of Contents

Advertisement

Installer manual Fleck 9100 SXT - Programming
Info
Setting a cycle step to 0 will cause the controller to skip that step during regeneration,
but keeps the following steps available.
The different regeneration cycles are listed in sequence based on the regeneration
flow selected for the system.
All cycles can be set from 0 to 199 minutes.
6.5.14.1 Regeneration abbreviations
B1
First backwash
B2
Second backwash
BD
Brine draw
6.5.14.2 For pre-set regeneration cycles
1. Press
or
2. Press
to validate the selection and move to the next parameter.
3. Repeat the two previous steps for each cycle.
6.5.14.3 For regeneration flow Other
Info
The regeneration cycles are identified as R1 to R6.
1. Press
or
2. Press
to validate the selection and move to the next regeneration
cycle.
3. Repeat the two previous steps for each cycle.
6.5.15
Day of week (Dn, n = 1 to 7)
Set the day of week for regeneration.
Info
The day of week parameter is only available if "day" mode has been set in controller
type selection.
1. Press
or
day.
2. Press
to validate the selection.
3. Repeat the two previous steps until D7 is set.
4. Press
to validate the selection and move to the next parameter.
54 / 108
to set the regeneration cycle time.
or to set the regeneration time of this cycle.
to set "ON" or "OFF" to set the day as a regeneration
BF
Brine fill
BW
Backwash
RR
Rapid rinse
Ref. MKT-IM-004 / E - 06.10.2020

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents