Regeneration Flows - Pentair FLECK 9100 SXT Installer Manual

Hide thumbs Also See for FLECK 9100 SXT:
Table of Contents

Advertisement

Installer manual Fleck 9100 SXT - Installation
5.7

Regeneration flows

Metered
The controller monitors the volume of water used. Once it calculates that there is not enough
capacity for the next operation day, a regeneration cycle will be initiated immediately or at a pre-
set time:
• immediate control: the controller measures water usage and regenerates the system as
soon as the system capacity is reached;
• delayed control: the controller measures water usage and if the capacity is not reached until
the number of days override, it regenerates the system, at the specified regeneration time.
38 / 108
Ref. MKT-IM-004 / E - 06.10.2020

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents