Chapter 4: Installing the Switch in an Equipment Rack

Beginning the Installation

Required Items

Switch
Orientations in
the Equipment
Rack
60
This section contains the procedure for installing the switch in a standard
19-inch equipment rack using the brackets supplied with the unit.
The following items are required to install the switch in an equipment rack:
Two equipment rack brackets (included with the switch)
Eight M4x6mm bracket screws (included with the switch)
Cross-head screwdriver (not provided)
Four standard equipment rack screws (not provided)
The switch has two sets of four screw holes on the left and right sides, for
attaching the brackets. Refer to Figure 19.
Figure 19. Bracket Holes on the Switch
456 8
1
3
5
7
9
PO
RT S
1G
1-2
11
LIN
0
2
K
AC T
10 0
4
13
LIN
K
AC T
6
15
PO
RT S
5G /2.
21 -24
17
5G /1G
8
LIN
K
10
19
AC T
10 0
LIN
12
21
K
AC T
23
14
FD X
16
25
SF
P+
HD
X
18
27 /S
CO
1
L
20
22
5G /2.
5G /1G
24
/10 0
26
CO
NS
10
G/
OL
1G
E
28 /S
2
LAS
ER
CLA
SS
PRO
1
DUC
T
4581
Bracket Holes