Installation Check - Siemens SITRANS F Operating Instructions Manual

Electromagnetic flowmeters
Hide thumbs Also See for SITRANS F:
Table of Contents

Advertisement

Connecting

5.3 Installation check

6. Tighten cable glands well to obtain optimum sealing. The cable entry gasket must obtain
firm contact with the cable.
7. Remount terminal box lid.
5.3
Installation check
The meter is now ready to go into normal operation - for commissioning and setting of
parameters refer to the relevant transmitter manual.
Before commissioning it must be checked that:
● The device has been installed and connected in accordance with the guidelines provided
previous in this chapter and in Installing/Mounting (Page 19).
38
CAUTION
Unscreened cable ends
Keep unscreened cable ends as short as possible.
CAUTION
Prevent interference
Separate electrode and coil cables to prevent interference.
WARNING
Use in hazardous area
Connect mains protective earth to the PE terminal in accordance with the above diagram
in order to obtain potential equalization.
SITRANS MAG 1100/1100 F
Operating Instructions, 08/2018, A5E03433301-AD

Advertisement

Table of Contents
loading

Table of Contents