Mercury 10 FOURSTROKE Installation Operation Maintenance Warranty Manual page 129

Table of Contents

Advertisement

4. Attach the shift cable to the shift lever with a washer and cotter pin
retainer.
d
a -
Cotter pin retainer
b -
Flat washer
c -
Shift cable
d -
Shift lever
5. Manually shift the outboard into neutral (propeller will rotate freely).
6. Adjust the cable barrel so the center mark on the cable is aligned with the
end guide when the cable barrel is placed in the barrel receptacle.
eng
ENGINE INSTALLATION
a
b
c
119
32105

Advertisement

Table of Contents
loading

Table of Contents