Mercury 10 FOURSTROKE Installation Operation Maintenance Warranty Manual page 127

Table of Contents

Advertisement

4. Connect the 8 pin connector to the engine harness. If the outboard is
equipped with power tilt, connect the power tilt wire connections.
a
b
BROWN/WHITE
a -
8 pin connector
b -
Remote wiring harness
c -
Rubber grommet
d -
Power tilt wire connections
5. Route the remote wiring harness through the rubber grommet.
6. Open up the clamp in the bottom cowl and position the remote wiring
harness below the clamp. Connect the 8 pin connector to the engine
harness. Push the clamp down and secure the remote wiring harness into
the bottom cowl.
SHIFT CABLE INSTALLATION
Install the cables into the remote control following the instructions provided with
the remote control.
NOTE: The shift cable is the first cable to move when moving the control box
out of neutral.
1. Locate the center point of the slack or lost motion that exists in the shift
cable as follows:
eng
ENGINE INSTALLATION
BLUE/WHITE
GREEN/WHITE
TAN
BLUE/WHITE
GREEN/WHITE
117
c
d
32064

Advertisement

Table of Contents
loading

Table of Contents