Assembly/Installation - Care of Sweden CuroCell Nova User Manual

Alternating pressure mattress
Table of Contents

Advertisement

3. Assembly/Installation

When unpacking the mattress, check that none of the parts are damaged. In the event of
damage, contact the manufacturer or your local dealer before using the product.
1. Place the mattress on the existing mattress and fasten
it with the elastic bands around the underlying
mattress.
Note!
• Make the bed with sheets for added comfort.
• Check that the CPR valve is closed.
2. Hang the pump at the foot end of the bed or place it on
a flat, sturdy surface.
Route the power cord so that there is no risk of it
causing someone to trip, being run over by the bed
wheels or getting crushed when the bed is raised or
lowered.
Note!
Make sure that the CPR valve is closed.
3.
Connect the mattress' air hoses to the side of the
pump. If the pump and hoses are equipped with quick
connectors, an audible "click" will be heard when these
have been connected correctly.
4. Check that the switch on the pump is in the "OFF"
position. Connect the plug to an approved electrical
socket. (220 V).
8

Advertisement

Table of Contents
loading

Table of Contents