3.2.2 Powering Off

If you need to power off the entire system, such as when switch or RAID system requires
firmware updates, adding a RAID system or client computer, power off in the reverse
order of Powering On. Before turning off SWF16, turn off the all the client computers first.
Wait for complete client computers to shut down and then the SWF16, then the ExaSAN
storage systems.
During RAID initiation or disk drive rebuilding, you can turn off the client computers only
and leave the SWF16 and storages powered on.

3.3 Installing the Installer Package

3.3.1 Before You Start

Before the installer package can be installed on Windows, Mac, and Linux platforms,
makes sure you have completed the following:
Setup your ExaSAN storage completely. Please refer to the ExaSAN storages' user
manual.
Install the HBA card to your host server.
Connect the QSFP cable between ExaSAN storages and SWF16.
Connect the QSFP cable between SWF16 and the host server.
Connect the switch LAN cables and power cord.
Power on the ExaSAN storages, SWF16 and the host server in the correct sequence.
3.3.2 Installing the installer package
The installer package can be downloaded from the Accusys website. Go to the
Accusys support page (http://www.accusys.com.tw/support/download.html) for
available downloads. Or you can find it from the ExaSAN installation DVD. If you need
more info or tech support, please contact your system integrator of ExaSAN product or
Accusys FAE Dept.
User Guide

Figure 27: power off sequence

3. Installation
Page 3-7

Advertisement

Table of Contents
loading

Table of Contents