www.ti.com
3
Quick Reference
Table 3
provides a quick summary of the connections required for operation of the EVM as a stand-alone
board.
SPI
Power
Analog Inputs
Analog inputs and external reference
SBAU107C – November 2004 – Revised November 2014
Submit Documentation Feedback
Figure 2. Default Software Screen
Table 3. Critical Connections
Function
SCLK
DIN
DOUT
DRDY/FSYNC
1.8V
3.3V
5.0V
AVDD (EVM supply)
AVSS (EVM supply)
DGND
AGND
Copyright © 2004–2014, Texas Instruments Incorporated
Pin
Header/Pin
Description
Name
J2.5
CLKR
SPI Serial Clock
J2.13 (Top)
DR
SPI Data Input to ADC (MOSI)
J2.13 (Bottom)
DR
SPI Data Output from ADC (MISO)
J2.9 Top
FSOUT
SPI new conversion indication (see
Section
J2.9 Bottom
FSR
J3.7
+1.8VD
1.8V supply for ADC DVDD (option)
J3.9
+3.3VD
3.3V supply for ADC DVDD (option)
J3.3
+5VA
5.0V supply for ADC AVDD
Positive supply for buffers (+15V)
J3.1
+VA
(only required when using analog buffers)
Negative supply for buffers (-15V)
J3.2
-VA
(only required when using analog buffers)
J3.5
DGND
Digital ground from MMB0
J3.6
AGND
Analog ground from MMB0
J4/5
Various Analog inputs and external reference to
ADC
ADS1271EVM and ADS1271EVM-PDK User's Guide
Quick Reference
5.6.2)
5
Need help?
Do you have a question about the ADS1271EVM-PDK and is the answer not in the manual?
Questions and answers