ADS1271EVM Hardware Details
5.2.2.1
Buffer Amplifiers
The buffer amplifiers on this EVM are OPA1632s (U5, U6). These amplifiers are optimized for ac
performance and are configured as fully-differential unity gain buffers. They require ±15V supplies, which
are provided from J3 pins 1 and 2.
The
OPA1632
requires a common-mode voltage, which is provided on this EVM by U2 and U3. Some
users may not wish to use the buffer amplifier section and provide the ±15V supplies. If the ±15V supplies
are not connected, then having a voltage on the V
ratings. Thus, U2 and U3 provide a separate 2.5V reference for the buffer amplifier section rather than
using the same reference as the ADS1271, which would always be powered. For this reason, U2 and U3
power is provided through a separate regulator, U11.
5.3
Digital Interface, J2
The ADS1271EVM is designed to easily interface with multiple control platforms. Samtec part numbers
SSW-110-22-F-D-VS-K and TSM-110-01-T-DV-P provide a convenient 10-pin, dual-row, header/socket
combination at J2. This header/socket provides access to the digital control and serial data pins of the
ADS1271.
Because the ADS1271 devices are capable of daisy-chaining, this EVM has been designed to permit
stacking; up to four EVMs can be stacked, allowing for eight devices to be placed in a signal chain. To
accommodate stacking of EVMs, J2 has some different connections on the top and the bottom side of the
board. Differences between top and bottom connectors are highlighted in
Pin Number
Signal
J2.1
SYNC
J2.2
MODE0
J2.3
CLKX
J2.4
DGND
J2.5
SCLK
J2.6
MODE1
J2.7
Unused.
J2.8
FSDIR
J2.9
Top: FSOUT
Bottom: FSR
J2.10
DGND
J2.11
Unused
J2.12
CLKRMODE
J2.13
Top: DIN
Bottom: DOUT
J2.14
CLKXMODE
J2.15
Unused
J2.16
SCL
J2.17
EXTCLK
J2.18
DGND
J2.19
OBCLKSEL
10
ADS1271EVM and ADS1271EVM-PDK User's Guide
pins of the amplifiers would exceed their maximum
OCM
Table 10. Digital Interface Pinout (J2)
Description
Synchronization Control
0 = High-Speed Mode
1 = Low-Power Mode
(In either case, only if Mode1=0)
CLKXMODE = 1: master clock output
CLKXMODE = 0: no connection
Digital ground
Serial Clock
0 = Mode determined by MODE0
1 = High-Resolution Mode
Indicates FSR direction:
0 = Output (DRDY in SPI™ mode)
1 = Input (FSYNC mode)
FSOUT: in FSYNC mode, copy of FSR; in SPI mode, not connected
FSR: in FSYNC mode, frame-sync input; in SPI mode, DRDY output from U8
Digital ground
0 = Use CLKR for SPI Clock
1 = Use ADC Clock for SPI clock
Top: Serial data input
Bottom: Serial data output
0 = CLKX is High Z
1 = CLKX outputs ADC master clock
2
I
C™ bus serial clock
External ADC clock input
Digital ground
Onboard Clock Select:
High to select onboard clock instead of external clock.
Copyright © 2004–2014, Texas Instruments Incorporated
Table
10.
SBAU107C – November 2004 – Revised November 2014
Submit Documentation Feedback
www.ti.com
Need help?
Do you have a question about the ADS1271EVM-PDK and is the answer not in the manual?