Tube Warm-Up Screen - GE Precision 500D Operator's Manual

Table of Contents

Advertisement

1-2Tube Warm–Up Screen
NOTE:
ILLUSTRATION 5-3
WARM TUBE SCREEN
om 5184516-100 Rev. 5
IMPORTANT!
A tube warm–up should be performed if the unit has not made an exposure in two
hours. This function will help extend the tube life. The Warm Tube button will
appear when a warm–up is required.
Select the Warm Tube button located on the lower right of the screen as shown in
ILLUSTRATION
5-3.
FLUORO TUBE
The technical factors as well as the number of exposures are preset. After select-
ing the appropriate tube for warm up, press the exposure button. Maintaining
pressure on the exposure switch will stop at the completion of the warm up proce-
dure. After the soak time has counted to 0 seconds, the close button must be
selected to continue.
Please remember to follow all radiation safety standards
while performing this and all procedures.
RAD TUBE
WARM TUBE BUTTON
5-3

Advertisement

Table of Contents
loading

Table of Contents